Thursday, 31 January 2013























Have a bit of time off so have been working on the Studebaker. Tank has been cleaned and lined. Gear box has been reassembled with new bearings and seals. Speedo cable regreased. The Engine is due back in 2 weeks and looking forward to that. Crank has been ground, Cam shaft has been returned reconditioned. Block has been cleaned ready for assembly. Radiator is in the shop getting a new core. rear suspenstion arms attached. Rear diff drained and oil replaced. front streeing box regreased. catch you all later.

Thursday, 17 January 2013

Jan 2013 finaly have time to make some progress

New bearings and seals in the gearbox. White metal on conrods replace with sheel bearings and brass sleves very cool. Oil pump reconditioned with new gears. Hardened valve seats in the exhust valves.