Thursday, 18 October 2012
October 2012
New springs on the front, Gas tank ready to conect just cheking if gage works and gas lines need attaching and new attachment straps made, engine (FC) has been bored and sleeved with cast iorn inserts. Big end bearings ground out and crank shaft ready for grinding and balancing. Valves to be placed (hardened inserts for exhaust valves to be done). Moving ahead slowly.
Monday, 13 August 2012
Saturday, 2 June 2012
Sunday, 27 May 2012
Saturday, 26 May 2012
Hi all the brakes and clutch, pressure plate assembly are back. The engine was fired up and ran for 15 mins. We then removed and have dissassembled the straight eight. A bit of wear and tear so off to the reconditioners as is the top and second gear in the WG T2C-1 transmission. Need to source the parts for this and the engine now.... "Nothing time and money won't fix!"